Liberty Expressway work to cause some delays - WALB.com, Albany News, Weather, Sports

Liberty Expressway work to cause some delays

Posted: Updated:
  • More WALB News10 HeadlinesMore News HeadlinesMore>>

  • Smack down on Cancer at the State Theater

    Smack down on Cancer at the State Theater

    Saturday, April 19 2014 11:54 PM EDT2014-04-20 03:54:50 GMT
    Wrestlers from all over Georgia and Florida were in town for the Smack Down on Cancer Event at the state theater. More >>
    Wrestlers from all over Georgia and Florida were in town for the Smack Down on Cancer Event at the state theater. More >>
  • Americus student honored in statewide design contest

    Americus student honored in statewide design contest

    Saturday, April 19 2014 7:59 PM EDT2014-04-19 23:59:05 GMT
    Indira Zelaya, a fourth grader from Sarah Cobb Elementary School in Americus, was honored in Atlanta recently for her artwork supporting Georgia's manufacturing industry.  She was nominated by South GeorgiaMore >>
    Indira Zelaya, a fourth grader from Sarah Cobb Elementary School in Americus, was honored in Atlanta recently for her artwork supporting Georgia's manufacturing industry.  She was nominated by South Georgia Technical College.More >>
  • Swimming pool destroyed after storm

    Swimming pool destroyed after storm

    Saturday, April 19 2014 7:32 PM EDT2014-04-19 23:32:11 GMT
    An Albany man arrived home to find his pool completely destroyed. He's not sure what happened, but the wall caved in and the concrete cracked. He says he's had the siding redone several times.More >>
    An Albany man arrived home to find his pool completely destroyed. He's not sure what happened, but the wall caved in and the concrete cracked. More >>
ALBANY, GA (WALB) -

Traffic on the Liberty Expressway may see some delays. Drivers are asked to be cautious in that area as signs and barrels or cones will be set out shifting traffic.

Georgia DOT crews will be closing one lane for westbound traffic as they continue work on the interchange reconfiguration.

Crews are placing overhead signs for the closing of exit ramp 5B.

The ramp will be relocated to Exit 5A.

Meanwhile, the traffic light at liberty and Jefferson is expected to be fully operational Thursday.

Copyright 2013 WALB.  All rights reserved.

Powered by WorldNow