W. Roosevelt traffic slowed by repair work - WALB.com, Albany News, Weather, Sports

W. Roosevelt traffic slowed by repair work

Posted: Updated:
ALBANY, GA (WALB) -

Albany City Engineer Bruce Maples announced the temporary closure of W. Roosevelt Avenue from Pine Avenue to N. Davis Street.

Beginning Monday, December 9, 2013, W. Roosevelt Avenue between Pine Avenue and N. Davis Street will be closed for storm water drainage improvement. This work is expected to last for several months.  

Oxford Construction Company has submitted a traffic control plan which will allow access to local business in the construction zone.  

The Roosevelt to Haley Storm Water Drainage Improvement Project is funded with SPLOST V funds.  

Motorists are advised to use caution, reduce speed, and be alert of changing traffic conditions in the area.

 

Copyright 2013 WALB.  All rights reserved.

Powered by WorldNow