Blasting of city mills dam held Tuesday morning - WALB.com, Albany News, Weather, Sports

Blasting of city mills dam held Tuesday morning

Posted: Updated:
Before.... (Photo credit: Jarrod Six) Before.... (Photo credit: Jarrod Six)
...and after.the explosion. ...and after.the explosion.
  • More WALB News10 HeadlinesMore News HeadlinesMore>>

  • Smack down on Cancer at the State Theater

    Smack down on Cancer at the State Theater

    Saturday, April 19 2014 11:54 PM EDT2014-04-20 03:54:50 GMT
    Wrestlers from all over Georgia and Florida were in town for the Smack Down on Cancer Event at the state theater. More >>
    Wrestlers from all over Georgia and Florida were in town for the Smack Down on Cancer Event at the state theater. More >>
  • Americus student honored in statewide design contest

    Americus student honored in statewide design contest

    Saturday, April 19 2014 7:59 PM EDT2014-04-19 23:59:05 GMT
    Indira Zelaya, a fourth grader from Sarah Cobb Elementary School in Americus, was honored in Atlanta recently for her artwork supporting Georgia's manufacturing industry.  She was nominated by South GeorgiaMore >>
    Indira Zelaya, a fourth grader from Sarah Cobb Elementary School in Americus, was honored in Atlanta recently for her artwork supporting Georgia's manufacturing industry.  She was nominated by South Georgia Technical College.More >>
  • Swimming pool destroyed after storm

    Swimming pool destroyed after storm

    Saturday, April 19 2014 7:32 PM EDT2014-04-19 23:32:11 GMT
    An Albany man arrived home to find his pool completely destroyed. He's not sure what happened, but the wall caved in and the concrete cracked. He says he's had the siding redone several times.More >>
    An Albany man arrived home to find his pool completely destroyed. He's not sure what happened, but the wall caved in and the concrete cracked. More >>
COLUMBUS, GA (WTVM) -

News Leader 9 was there as construction crews blew out a 100 foot section of the city mills dam Tuesday morning at about 10:30 a.m. EST.

Even though this dam is in a less-populated area, it could still create an inconvenience for some motorists as some roads will be closed.

But breaching this dam is one of the final steps organizers must take to have the course opened by Memorial Day weekend.

The two and a half mile long whitewater rafting course is scheduled to open May 25.

It should take workers about three weeks to clear the debris from today's blast.

Spectators were allowed to watch the explosion from the 14th Street pedestrian bridge beginning at 9:45 a.m.

Copyright 2013 WTVM. All rights reserved.

Powered by WorldNow