Broad Ave. Bridge demolition stalled by weather - WALB.com, Albany News, Weather, Sports

Broad Ave. Bridge demolition stalled by weather

Posted: Updated:
  • More WALB News10 HeadlinesMore News HeadlinesMore>>

  • Smack down on Cancer at the State Theater

    Smack down on Cancer at the State Theater

    Saturday, April 19 2014 11:54 PM EDT2014-04-20 03:54:50 GMT
    Wrestlers from all over Georgia and Florida were in town for the Smack Down on Cancer Event at the state theater. More >>
    Wrestlers from all over Georgia and Florida were in town for the Smack Down on Cancer Event at the state theater. More >>
  • Americus student honored in statewide design contest

    Americus student honored in statewide design contest

    Saturday, April 19 2014 7:59 PM EDT2014-04-19 23:59:05 GMT
    Indira Zelaya, a fourth grader from Sarah Cobb Elementary School in Americus, was honored in Atlanta recently for her artwork supporting Georgia's manufacturing industry.  She was nominated by South GeorgiaMore >>
    Indira Zelaya, a fourth grader from Sarah Cobb Elementary School in Americus, was honored in Atlanta recently for her artwork supporting Georgia's manufacturing industry.  She was nominated by South Georgia Technical College.More >>
  • Swimming pool destroyed after storm

    Swimming pool destroyed after storm

    Saturday, April 19 2014 7:32 PM EDT2014-04-19 23:32:11 GMT
    An Albany man arrived home to find his pool completely destroyed. He's not sure what happened, but the wall caved in and the concrete cracked. He says he's had the siding redone several times.More >>
    An Albany man arrived home to find his pool completely destroyed. He's not sure what happened, but the wall caved in and the concrete cracked. More >>
ALBANY, GA (WALB) -

Recent heavy rain has stalled demolition of the old Broad Avenue Bridge in downtown Albany.

The construction company, PCL, was supposed to have the demolition work finished by February 15th.

The Georgia Department of Transportation granted them an extension to March 15th.

If work isn't finished by then, there could be a longer delay.

Work could be forced to stop during the breeding season for an endangered species of mussel.

Construction workers have already started on some footings for the new bridge.

 

Copyright 2013 WALB.  All rights reserved.  

Powered by WorldNow